Genc Berisha
All work

How do new artists find their first true fans?

Fancircle. A loyalty-based social app for music, with a fan app and an artist app. I helped shape the product from the idea stage and led design to v1.0.

Role
Head of Design
Team
Founder, COO, project manager, 2 growing to 5 developers, QA
Timeline
2023 to 2025
Platform
iOS and Android
Creative Room: a song's waveform with time-stamped comments, next to the feedback history.

My part

I co-shaped the product with the founder and designed both apps end to end, including SongMatch and Creative Room, plus the prototypes and decks used with investors and artists. The founder set the vision, a project manager ran delivery, and a team that grew to 5 developers and QA built it.

The problem

Artists earn about 0.003€ per stream, and social media gives them reach but no real relationship with the fans who were there first. Most fans say they would support their artists directly if there were a good way to do it.

Two apps, one product

Fans want to discover and feel close. Artists want to publish, reward and understand their community. One interface for both would have made each side worse, so I designed two role-based apps on one shared system: 300+ frames for fans, 400+ for artists.

Figma overview of the fan app.
Fan app
Figma overview of the artist app.
Artist app

SongMatch: discovery like dating

Scrolling a catalogue is tiring. I borrowed a gesture everyone knows: swipe right to like a song, left to skip. Every like lands in a playlist the fan can keep.

SongMatch flow from the Explore card to the saved playlist.
From Explore to playlist

Creative Room: feedback pinned to the moment

"The middle part feels off" wastes everyone's time. In Creative Room, collaborators select part of the waveform and leave a note there, SoundCloud style, and a timeline keeps every upload, comment and task in order.

Creative Room project timeline.
The project timeline

Outcome

  • v1.0 designed and built for iOS and Android.
  • 50+ artist commitments before launch, won with the app prototypes and pitch decks I designed.
  • A registered EU trademark.

The product did not take off. The company ran out of money before it found its users.

What I'd do differently

Our scope grew faster than the team could build, and the core loop was never tested on its own. Today I'd push for a tight MVP around that one loop, agree on a single success metric, and put it in front of real fans first. Saying no to features is part of the job.